Oil & Gas
Decommissioning

Removing offshore structures below the seabed, safely and cleanly

When an oil or gas field reaches the end of its life, North Sea rules require the operator to remove jackets, piles and conductors below seabed level. DECO Subsea combines internal pile dredging with ultra-high-pressure abrasive waterjet (AWJ) cutting to make these cuts safely and efficiently, even through stiff clay or grout and at depths down to 174 m. We cut piles, conductors, multi-string conductors, caissons and lifting holes, and work as an integrated part of the heavy-lift contractor’s team. Our track record includes more than 1,440 pile cuts, 850 hole cuts and 750 dredged piles, on projects such as Leman BH, Camelot, K10-B, the Welland field, the South Riding Point pipeline and the SEP Orion jack-up. Recent projects include the Veslefrikk-A jacket for Heerema, FPSO mooring piles for Boskalis and a four-leg platform removed from the Gulliver for Scaldis.

DECO Subsea brochure
DECO Subsea brochure
DECO Subsea brochure
DECO Subsea brochure
DECO Subsea brochure
DECO Subsea brochure
DECO Subsea brochure
DECO Subsea brochure
DECO Subsea brochure
DECO Subsea brochure
DECO Subsea brochure
DECO Subsea brochure